Working it out
-
- Posts: 4
- Joined: Wed Feb 18, 2009 10:07 pm
- Location: West Sussex
-
- Site Admin
- Posts: 1854
- Joined: Tue Aug 19, 2008 7:03 pm
- Location: kings lynn norfolk
- Contact:
you will get around 6-7 tons depend on the material being dug out, should all go in a 8 yard skip MSH
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk
http://mshpaving.co.uk
-
- Posts: 1990
- Joined: Sun Mar 25, 2007 10:49 pm
- Location: N/Ireland
Technically yes but once excavated the volume will increase by anything from 1.3 to 1.6 times depending on the type of excavated material. This is only a guideline and can vary enormously if you add concrete etc into the equation. If it's normal earth multiply the solid cubic m by 1.5 and you'll get the close to the amount you'll end up with. If you're filling skips then layer it and foot stamp and you'll make it go a lot further. It should weigh approx 6.5 ton. These are all guesstimates and depending where you are and what you will be shifting could be way off.
Can't see it from my house
-
- Site Admin
- Posts: 1854
- Joined: Tue Aug 19, 2008 7:03 pm
- Location: kings lynn norfolk
- Contact:
-
- Site Admin
- Posts: 4420
- Joined: Sat Aug 09, 2008 3:55 pm
- Location: high peak
- Contact:
http://www.source4me.co.uk/calculate_ex ... _spoil.htm
a good web site i use a lot
bulking calculator
gi
a good web site i use a lot
bulking calculator
gi
Giles
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.
http://www.gbgroundworks.com
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire