Posted: Sat Oct 25, 2008 11:45 am
quoting on a job to install 250mx1mx1m trench for ground source heat pumps, spec just says lay 100mm sand in trench, pipe and cover with 200mm sand.
should i just use builders sand or sharp sand its only to protect the pipe?
thinking that builders sand gets water logged quiet easyily
and can anyone give me a rough idea of the price of a 20 ton loads, worked on £300 a load in quote. need 75m3 = 120 tons of sand at 1.6 tons a m3.
giles
should i just use builders sand or sharp sand its only to protect the pipe?
thinking that builders sand gets water logged quiet easyily
and can anyone give me a rough idea of the price of a 20 ton loads, worked on £300 a load in quote. need 75m3 = 120 tons of sand at 1.6 tons a m3.
giles