Page 1 of 1
Posted: Tue Jan 29, 2008 7:15 pm
by sako
Hi.Does anyone know how much concrete a 1 tonne bag of sandy gravel will make 5-1 guage.?
sean.
Posted: Tue Jan 29, 2008 7:28 pm
by James.Q
check on main site under concrete mixing on site its all there
JQ
Posted: Tue Jan 29, 2008 10:54 pm
by lutonlagerlout
.5m3
LLL
or thereabouts
Posted: Wed Jan 30, 2008 4:37 pm
by sako
Cheers,I am going to put a footing 200mm wide by 75mm deep all way round my garden to set some block paviours on to act as a mowing strip and was trying to work out required quantity so thanks for help.
I am assuming that putting a footing round and then laying paviours on mortar will be best idea?Last year i built the levels up in my garden so it has had a good 8 months of rain etc to settle it all.Hope it works out ok sean.
Posted: Wed Jan 30, 2008 7:15 pm
by lutonlagerlout
i did exactly the same thing 3 years ago sako,but i used concrete and bedded the clay paviours straight onto the concrete,saves making 2 jobs out of 1
IYKWIM
LLL
Posted: Wed Jan 30, 2008 8:12 pm
by Pablo
Defo you're making hard work of an easy job there.
Posted: Wed Jan 30, 2008 8:44 pm
by sako
Hi.Yes i did think of doing it the way you are suggesting but as i have not laid any of this of done any brick work i thought i may be easier for me to wait for concrete to go off then just use mortar mix to lay them.
The length per run is approx 9 metres so would i have to get it all done in a day or could i stop just join next bit of bedding mix onto existing??
Just not sure i could lay 9 metre run in same day.
sean.