Posted: Mon Jan 28, 2008 6:16 pm
Hi All
Another novice here.
I have to build a 16m x 4m slab to situate a timber built cattery on. I've been led to believe that a DPM is not required or needed as the slab is open to the elements. The slab will have a limestone hardcore.
Is this the case or should I use a DPM?
Many Thanks