The roundabout near where I work (J9, M27) is being widened to accommodate a fourth lane, being intrested in this sort of thing has lead me to having a good look when driving or walking past. However, what they are doing doesn't make sense IAW what I was expecting.
They have dug down 6' where the new lane is going, shifted any pipes/cabling (gas, street lighting, traffic control) either further into the roundabout where possible or buried below this 6' dig and covered with 6" of what looks like lean mix.
Now this is the bit that really does make sense, they have now backfilled 4' (so far) of the 6' with layers of compacted crusher run. Why dig so far down? If you are going dig this far down and build up why use crusher run not Type 1? As it has natural restraint on both sides why dig half that depth and fill with concrete.
Am I being a bit naive or am I just total missing something, either way it is great to watch. Shame I can't see it from the window of my office!!!
Mike
They have dug down 6' where the new lane is going, shifted any pipes/cabling (gas, street lighting, traffic control) either further into the roundabout where possible or buried below this 6' dig and covered with 6" of what looks like lean mix.
Now this is the bit that really does make sense, they have now backfilled 4' (so far) of the 6' with layers of compacted crusher run. Why dig so far down? If you are going dig this far down and build up why use crusher run not Type 1? As it has natural restraint on both sides why dig half that depth and fill with concrete.
Am I being a bit naive or am I just total missing something, either way it is great to watch. Shame I can't see it from the window of my office!!!
Mike