Hope its ok to ask a few questions at the same time...
I need to know the motar ratio for laying 7n dense blocks, and if i need to dip the blocks in water to stop them supping the water out of the motar too quickly. And finally can someone telll me what volume of soil i will get from the following area for skip hire purposes. The area is 6.8mx6.4m the ground slopes from apx 600mm high to ground level with a little bit of a hummuck in the centre. I need to know this so i can hire a skip big enough for the soil. I have worked it out at 18m3 but i am not sure if i have done the calculation properly. I took the highest measurement and halved it to give me the average. Thanks for any help .
Tony
I need to know the motar ratio for laying 7n dense blocks, and if i need to dip the blocks in water to stop them supping the water out of the motar too quickly. And finally can someone telll me what volume of soil i will get from the following area for skip hire purposes. The area is 6.8mx6.4m the ground slopes from apx 600mm high to ground level with a little bit of a hummuck in the centre. I need to know this so i can hire a skip big enough for the soil. I have worked it out at 18m3 but i am not sure if i have done the calculation properly. I took the highest measurement and halved it to give me the average. Thanks for any help .
Tony