Gravel on concrete - drive

Setts and cobbles, tarmac, asphalt, resin systems, concrete whether it's plain, patterned or stencilled, gravels, etc.
Post Reply
fredmila
Posts: 23
Joined: Fri Aug 24, 2007 2:00 pm
Location: sleaford

Post: # 41353Post fredmila

I know there are pages, on this site, dealing with this problem but I want to ask if anybody has had any good ideas or whether they like mine.
I have a very old concrete drive. It is cracked, uneven and patchy. It is not even good enough for the resin gravel types. But it is very firm and I wish to keep it as a base for a new gravel drive. My idea is to break it with a jack hammer but leave it in place. This way (I hope) it will create edges for the gravel to grab hold of and it will make gaps for the water to drain. I can then lay angular gravel or even self-binding gravel -although the latter sounds expensive-

Ideas and opinions appreciated

Existing surface:
http://img171.imageshack.us/img171/9224/drivesurface.jpg

My idea for the work:
http://img171.imageshack.us/img171/1913/driveprofile.jpg

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 41356Post lutonlagerlout

there are loads of reasons why this wont work fred
the gravel will migrate over the solid concrete bits

you would be better off breaking out all the old stuff into a pile,digging out any weeds etc and treating with weedkiller,then lay terram or multitrack over the subgrade.

once you are at this stage hire a crusher for a day and crush your hardcore ,spreading it as you go, then wack the crushed
then spread your aggregate and wack that too

i know this seems much more drawn out,but it will be a better job

LLL :)




Edited By lutonlagerlout on 1251727843
"what,you want paying today??"

YOUR TEXT GOES HERE

Tony McC
Site Admin
Posts: 8346
Joined: Mon Jul 05, 2004 7:27 pm
Location: Warrington, People's Republic of South Lancashire
Contact:

Post: # 41364Post Tony McC

Even breaking up the old concrete, putting gravel of *any* description over a hard base is a surefire shortcut to A&E.

LLL's advice is spot on: break it up, hoick it out, chuck it in a crusher, spew it out and use it as sub-base.
Site Agent - Pavingexpert

msh paving
Site Admin
Posts: 1854
Joined: Tue Aug 19, 2008 7:03 pm
Location: kings lynn norfolk
Contact:

Post: # 41368Post msh paving

I could hire you a micro crusher,PM if interested MSH :)
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk

fredmila
Posts: 23
Joined: Fri Aug 24, 2007 2:00 pm
Location: sleaford

Post: # 41371Post fredmila

msh paving wrote:I could hire you a micro crusher,PM if interested MSH :)
How much and where are you?

msh paving
Site Admin
Posts: 1854
Joined: Tue Aug 19, 2008 7:03 pm
Location: kings lynn norfolk
Contact:

Post: # 41373Post msh paving

im in kings lynn ,bout 45 mins from sleaford,£150+vat day £15 delivery MSH :)
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk

fredmila
Posts: 23
Joined: Fri Aug 24, 2007 2:00 pm
Location: sleaford

Post: # 42146Post fredmila

I have not started the job but this time I am really starting. Something occured to me on double-checking the surface. We all assumed that the gravel level would be immediately above the concrete level (or close). But I have found that there are various areas where the concrete level is up to 100mm below the gravel top. If I remove the concrete, which can be up to 100-150mm thick I may end up with up to 200-250mm away from the top surface. Why remove the concrete in the deep areas?

msh paving
Site Admin
Posts: 1854
Joined: Tue Aug 19, 2008 7:03 pm
Location: kings lynn norfolk
Contact:

Post: # 42147Post msh paving

you won't drive a car on deep gravel,you get stuck MSH :)
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk

Post Reply