Hi
I need to fill a strip foundation.This part of the strip foudation forms one section of the total strip. Hopefully I can apply the solution to the remainding parts.
The foundation will have to have 3 different levels. 2 for differring bridge over drain levels and the final building level.The bridging drain levels will have to be 1m back from from the drains to accomodate the respective steels/lintols. I am looking at a foundation with stepped levels. The only way I can think of doing this is with 3 pours. 1 for the 1st level and so on. The only problem with this is that the last our would only about 200mm thick from a toatal depth of 1.1m. I am thinking of using reinforcing bars through the total pour.
Is there a better and quicker way as I assume each pour of concrete would have to dry befor the next lot can be poured onto. Btw I am not using a ready-mixed.
I need to fill a strip foundation.This part of the strip foudation forms one section of the total strip. Hopefully I can apply the solution to the remainding parts.
The foundation will have to have 3 different levels. 2 for differring bridge over drain levels and the final building level.The bridging drain levels will have to be 1m back from from the drains to accomodate the respective steels/lintols. I am looking at a foundation with stepped levels. The only way I can think of doing this is with 3 pours. 1 for the 1st level and so on. The only problem with this is that the last our would only about 200mm thick from a toatal depth of 1.1m. I am thinking of using reinforcing bars through the total pour.
Is there a better and quicker way as I assume each pour of concrete would have to dry befor the next lot can be poured onto. Btw I am not using a ready-mixed.