Posted: Wed May 04, 2005 8:03 pm
i.m laying a small track for bikes. i need to finish up with 100mm of type1 and 25mm of 12mm agg dust. what depth do the materials need to laid at to achieve these dims after compaction with a twin drum.
Paving, Drainage and Hard-landscaping in Britain and Ireland
https://ext.pavingexpert.com/brewcabin/