I need to write a resurfacing specification for a tarmac car park. Im not sure how to write it has anyone got one i can look at.

Tony McC
Site Admin
Posts: 8346
Joined: Mon Jul 05, 2004 7:27 pm
Location: Warrington, People's Republic of South Lancashire
Contact:

Post: # 7250Post Tony McC

Do you still need this or am I too late?
Site Agent - Pavingexpert

jones2004
Posts: 68
Joined: Wed Sep 22, 2004 8:41 pm
Location: wales

Post: # 7258Post jones2004

No, your not to late!

Tony McC
Site Admin
Posts: 8346
Joined: Mon Jul 05, 2004 7:27 pm
Location: Warrington, People's Republic of South Lancashire
Contact:

Post: # 7261Post Tony McC

OK: tell me more about the works that needs to be done.
Site Agent - Pavingexpert

jones2004
Posts: 68
Joined: Wed Sep 22, 2004 8:41 pm
Location: wales

Post: # 7262Post jones2004

The area to be tarmacked is 3000m2 my employer wants liquid bitumen laid ontop of existing tarmac and new layer of wearing course added is this correct? or should it be planed? does it matter?

How should the spec be written as the one ive got to copy does not look that in depth!

Tony McC
Site Admin
Posts: 8346
Joined: Mon Jul 05, 2004 7:27 pm
Location: Warrington, People's Republic of South Lancashire
Contact:

Post: # 7266Post Tony McC

So: this is a potential overlay? The condition of the existing surface determines whether it needs to be planed or milled, but, if it's "reasonable", a simple tack coat and overlay may suffice. However, if it's in any way ropey, it may need planing, or it may be better to cut out patches, re-base them, and then overlay. There may also be a need to regulate, if levels are awry in any way.

If you're not able to survey and spec the work yourself, it's probably best to bring in 3-5 surfacing contractors and get them to talk you through what they believe is necessary, then you'll get a feel for what's actually necessary. It's important that all the contractors are pricing the same work, so, once you've walked the site with the contractors, that's the time to draw up the spec, add in the quantities, and then send out a tender document, otherwise you get each contractor pricing what they think they can get away with, rather than the work that's actually required.
Site Agent - Pavingexpert

jones2004
Posts: 68
Joined: Wed Sep 22, 2004 8:41 pm
Location: wales

Post: # 7269Post jones2004

Thanks Tony for the reply!