Posted: Tue Sep 20, 2016 4:38 pm
by jwill
Got a job which needs a new ground floor connection to a 6" clay combined. I thought the drain was only for this house, was only expecting 4". Anyway, apart from the drain being bigger than I thought, it's also deeper. Best part of 1200mm. Luckily specified a depth in quote.

The punters wanted IC as they've had drain problems in the past. you can see from the photo though this drain isn't centre of the entry, the water supply would need re routing and with depth and size of drain its going to be min 450mm chamber which just isn't going to fit. Pretty sure they will be okay with me knocking that on the head after I explain the above. I will put rodding access further upstream on my connection.

What would be ideal way to connect? I've used pvc 6" with 4" 45 deg branch before. Band seals to the existing both sides. Just means I'm going to have to dig the best part of 3ft along this drain to make the connection and get the seals on. Im also conceded about it being 12"/18" deeper than the footing for the wall at the side.

There is a cast stench pipe about 5ft further upstream than where my connection comes out the house. I thought I might be better off cutting a section out of this and making a vertical connection with a 90 branch. Can you get adjustable fittings or do you just use band seals again? I would make the connection below ground as the new connection is ground floor.

Image

Image


free upload image

Posted: Tue Sep 20, 2016 8:15 pm
by seanandruby
Can't you introduce an in situ traditional hand built manhole/IC and run everything into it with slippers etc:

Posted: Tue Sep 20, 2016 8:51 pm
by jwill
I had that thought too but the edge of the drain is near enough flush with the footing.

It's bad really that whole wall has that drain underneath the whole run. B.C would never let you do that now without encasing in conc. The wall has moved over time and a few cracks been repointed. Wonder if this is owt to do with. To be fair was dry as a bone down there though.

The more I think about it cutting a section out of that cast iron soil is sounding better!

Posted: Wed Sep 21, 2016 7:17 am
by seanandruby
We had to build over an existing big concrete pipe once close to the end of building. We cantilevered with 30 ml rebar an also placed polystyrene on top of pipe before concreting.

Posted: Mon Sep 26, 2016 2:16 pm
by jwill
Dug around the stench pipe today and drain comes up in pot 4". Because the drain is so deep i've got plenty of room to put a branch in, keep pipework below ground and still get a fall. No IC but at ground level of this stench pipe is rodding access, plus i'll put an access 90 where my bend comes thru wall and into the ground.

Was way too much work the other way round

Posted: Mon Sep 26, 2016 2:44 pm
by seanandruby
You really need to be going to an I C outside the building.

Posted: Wed Sep 28, 2016 7:47 pm
by jwill
Bit pic heavy but see below. This is the way I had to do it. Like you say ic would have been ideal but due to circumstances completely over complicated the job. Old rodding access above new branch and new rodding access where I've took thru old air brick hole into house. Got about another 500mm drop to 6" invert level from this branch. Topped up pea gravel after test
Image

Image

Image

Image

Image

Image


screen shot on windows

Posted: Sun Oct 02, 2016 12:14 pm
by Dave_L
Nice job, that's a lot of work there.