Posted: Tue Jan 13, 2015 1:37 pm
I am having a new soil pipe connection and and a rainwater gulley being put in.
2 quotes obtained - both will leave it so that the hole is ot filled in and I will backfill with mud and put a patio back on.
They will leave shingle under the pipe for building control to sign off.
One person has said that I should leave the work he has done for 2 weeks to allow things to 'settle' before I backfill.
Cannot see any justification for this.
They will be putting some concrete in as the connectiosn are close to the foundations of my house - so I wonder if it is the concrete that needs time to dry?
As it happens the work will be done on Wednesday and it would be Saturday earliest til I considered backfilling.
Also should I use the nciest soil/stone free as I can to cover the pipes up? Or shoudl I bung the nastiest soil down first so the ncier stuff is closer to the surface.
Thoughts?
2 quotes obtained - both will leave it so that the hole is ot filled in and I will backfill with mud and put a patio back on.
They will leave shingle under the pipe for building control to sign off.
One person has said that I should leave the work he has done for 2 weeks to allow things to 'settle' before I backfill.
Cannot see any justification for this.
They will be putting some concrete in as the connectiosn are close to the foundations of my house - so I wonder if it is the concrete that needs time to dry?
As it happens the work will be done on Wednesday and it would be Saturday earliest til I considered backfilling.
Also should I use the nciest soil/stone free as I can to cover the pipes up? Or shoudl I bung the nastiest soil down first so the ncier stuff is closer to the surface.
Thoughts?