Hi, need a little bit of advice,
Getting rid of lawn at rear of semi-D and replacing with concrete, Area approx 6m x 6m. Was thinking of forming new yard gulley at centre of square and have the fall 1:60? going four ways to the centre, kind of forming a saucer shape.
Gulley will be connected to the house drainage system as water table is very high in clay soil.
Is this practical? Is one collection point at centre enough?
Kind of limited as to ways of directing run-off because of existing structures and levels.
Thanks for any advice.
Getting rid of lawn at rear of semi-D and replacing with concrete, Area approx 6m x 6m. Was thinking of forming new yard gulley at centre of square and have the fall 1:60? going four ways to the centre, kind of forming a saucer shape.
Gulley will be connected to the house drainage system as water table is very high in clay soil.
Is this practical? Is one collection point at centre enough?
Kind of limited as to ways of directing run-off because of existing structures and levels.
Thanks for any advice.