Posted: Tue Mar 05, 2013 12:01 am
Hi
This'll hopefully be my last question before starting my lawn drain project. I'm going to lay the pipes in a herringbone layout but what is best? - do I join the side drains with 45 deg. land drain junctions or have the side drain trenches slightly higher than the main drain trench and allow the water to run on top of the main pipe?
The reason I ask is I would need about 8-10 junctions which works out at about £ 60-75. If I can get away without them it'll save me money and there will slightly less digging! but I want do it right so if junctions are best I'll use them.
Cheers for your time,
Steve
This'll hopefully be my last question before starting my lawn drain project. I'm going to lay the pipes in a herringbone layout but what is best? - do I join the side drains with 45 deg. land drain junctions or have the side drain trenches slightly higher than the main drain trench and allow the water to run on top of the main pipe?
The reason I ask is I would need about 8-10 junctions which works out at about £ 60-75. If I can get away without them it'll save me money and there will slightly less digging! but I want do it right so if junctions are best I'll use them.
Cheers for your time,
Steve