This page at the bottom says that a gap can be left between paving and the wall and filled with gravel but is 'rarely if ever employed in the trade'. Is this true when the paving is less that 150mm beneath the DPC?
We are trying to work out if we need a linear channel, they have never been mentioned when we got quotes. Our current patio (to be replaced) is 75mm from the DPC and we cannot lower the level.
Thanks for your advice.
Is a linear drain always used near dpc? - Diy arrangement not used in the trade?
-
- Posts: 1568
- Joined: Mon May 10, 2010 9:58 pm
- Location: Gatwick
- Contact: