Posted: Fri Mar 25, 2011 7:22 pm
by Adam Ashworth
hello,

As a few of you know i will be having ago at my drive shorty and a concerned about a few things, most of which you have answered - thanks for that.

My drive will slope towards the house, so before the house i will be putting a aco drive drain in along the front (but will have a layer of edging touching the house) this wil run into a soakaway. I have read on here that the edging is concreted on the sub base but how can i compact my MOT type 1, lay the edging and then fit the drive drain on because surely this must have to be done before i even put the MOT down so i can connect it up to the drainage pipework? Do you need mot under the drive drain? I see on here it should be laid on 100mm of concrete but what about under the concrete?

If i lay my drain in first i wont be able to compact my type 1 at the front for the house (inbetween the drain and the house)

Hope i am making sense. Thanks for all your advise

Posted: Fri Mar 25, 2011 7:34 pm
by GB_Groundworks
2 options stone it up dig through the mot and lay or dig out lay it and the concrete is fine going on good firm ground

Posted: Sun Mar 27, 2011 11:40 am
by Dave_L
I'd favour the dig it out, stone it up and dig through the stone option. Add/trim the stone to final level after installation of said drainage.