Page 1 of 1
Posted: Wed Jan 12, 2011 10:24 pm
by GB_Groundworks
excuse the ipad sketch, get funny looks groundworker quoting on his ipad haha
so i need to put a new gully in where the green circle is to take the sink and washing machine waste which is currently going wronly into the top water which has been cut and blocked about 10 metres from their boundary in the rd
so doing it properly running it rd into the foul in the block paved patio, questions.
best way to connect the 110mm plastic into the salt glaze, to do it properly means an ic so what 2 ad4000 rubber addapters then 330 plastic swept T ic and bring it up into the block paving?
or other ideas? anyway know of any ic that fit salt glaze that take 110mm plastic from the gully
Edited By GB_Groundworks on 1294871341
Posted: Wed Jan 12, 2011 10:35 pm
by msh paving
hepworth manhole take supersleave pipe and plasic pipe, but supersleave is smaller dia. than regular salt glaze
i would stick to using AC4000 as you know it will work with no messing MSH
Posted: Thu Jan 13, 2011 6:22 pm
by flowjoe
Can you not just install a roddable gully and or fit rodding point ?
Posted: Thu Jan 13, 2011 7:05 pm
by GB_Groundworks
Rather than the ic? Thought you had to have ic on 90 degree change of direction? I'm going to have to put all the green pipe work in and join it to the salt glaze?
Posted: Thu Jan 13, 2011 7:18 pm
by flowjoe
Thought the green circle was a gully ? not a manhole ?
Can you put a roddable gully on the corner and run to a blind junction onto the VC (doing away with the 90 degree bend). or put a roddable gully where the sink is, run that to a junction on the corner (with rodding access upstream of the junction) and run that to a blind junction on the VC ?.
Posted: Thu Jan 13, 2011 7:37 pm
by GB_Groundworks
Yeah that what I was thinking can I do a blind swept junction onto the vitrous clay or does that have to be accessible, I think not as you can rod from gully and from the existing man hole.
What's the best way to join onto the vc Paul?