Posted: Sat Apr 17, 2010 1:26 pm
As I have mentioned previously, I am going to replace my old lead pipe (which I have excavated) with a length of MDPE.
However, I'm a bit confused at the moment (doesn't take much). I opened the little Water hatch on the pavement...
and I expected to find a stop valve in there. But it looks empty. I dug down a bit in the earth with a trowel but still didn't find anything. The direction of the pipe appears to correspond with the positioning of this hatch so I really expected to find a valve in there.
How do I go about turning off the water before I start to cut out the lead pipe ??
Any advice would be greatly appreciated.
Thanks
Paul
However, I'm a bit confused at the moment (doesn't take much). I opened the little Water hatch on the pavement...
and I expected to find a stop valve in there. But it looks empty. I dug down a bit in the earth with a trowel but still didn't find anything. The direction of the pipe appears to correspond with the positioning of this hatch so I really expected to find a valve in there.
How do I go about turning off the water before I start to cut out the lead pipe ??
Any advice would be greatly appreciated.
Thanks
Paul