hi all i am laying down new sewer pipes and the plan states something about pegs? also 140 fall ? sorry dont blast me for not getting a contractor in money is really tight right now . so going to try myself.just need to know how to peg out

thanks

Posted: Sun Mar 21, 2010 6:20 pm
by seanandruby
Hi africa, go to the main index, drainage page.

Posted: Sun Mar 21, 2010 6:27 pm
by seanandruby
tried a quick link but failed :p Where's my grandaughter when i need her :laugh:

Posted: Sun Mar 21, 2010 7:23 pm
by msh paving
Hey sean i'm not your grandaughter but this is what you need.....
all about drainage laying


MSH :) :)

Posted: Mon Mar 22, 2010 7:25 pm
by africa
thanks for your help . but how do you set out and peg so as to have the right gradient?

Posted: Mon Mar 22, 2010 7:34 pm
by irishpaving
How long is the new run of drainage..

Posted: Mon Mar 22, 2010 9:27 pm
by Mikey_C
the fall your drawing calls up 1:40 means that you need 1 unit down for every 40 units along, units can be whatever you want millimeters, meters, feet, yards, furlongs, miles etc.

use something at the start and end of the drainage run that you can mark height with, wooden peg, lattern iron, earth rod, steel bar etc. Get a level for these two points then drop the one at the low end of your run by, length of run/40.

this made sense as I typed it in but it might not on re-read.

Posted: Tue Mar 23, 2010 6:10 am
by africa
thanks for all your help guys got it now .it's just as i thought but was 100% not sure :D