Posted: Tue Apr 14, 2009 10:27 am
I am setting my gullies into position ready to drain a stone patio.I have established the fall to them and at what height they should be if set to the surfice of the flags.Should they be set dead level and notched tight to flag or should they be lowered slightly down with a wider notch(say 10-12mm leaving a similar width to the flag gaps) and haunch the pointing down to the gully thus helping to speed up water despersal and if so by how much should they be lowered.
Many thanks.
Many thanks.