Posted: Tue Aug 07, 2007 10:18 am
Hi,
The house I've just moved to has downpipes that, helpfully, end approx. 2 inches below the surface. Funnily enough, this gives us some problems with the downpipes backing up when it rains.
Using the calculations on the site, I’ve worked out an approx 90m2 area needs to be drained, which comes to a 1.5m3 soakaway. Trouble is, that this would work out to a 3m deep excavation if I used the IC sections suggested. That’s a lot to hand-dig, and would be tricky to get a machine big enough onto the site. That plus the extra messing about with shoring and suchlike? I just don’t fancy my chances.
So, looking at the SUDS-type “crates� to create the required volume in a narrow strip next to the site boundary, but I don’t like the lack of access to the chamber these give.
What’s the life expectancy of these “crates�? Do they suffer from silting up? Should I buy\build a silt trap ahead of the chamber?
The other problem is that I *cannot* get fully 5m away from the existing building, going to end up at 4.5 max. Would it be sensible to wrap the “building� side of the chamber in non-permeable material to try and divert the water away from the building, or is it so close to correct that it’s not worth the trouble?
(Soil conditions seem good, no waterlogging that I can find)
Cheers.
The house I've just moved to has downpipes that, helpfully, end approx. 2 inches below the surface. Funnily enough, this gives us some problems with the downpipes backing up when it rains.
Using the calculations on the site, I’ve worked out an approx 90m2 area needs to be drained, which comes to a 1.5m3 soakaway. Trouble is, that this would work out to a 3m deep excavation if I used the IC sections suggested. That’s a lot to hand-dig, and would be tricky to get a machine big enough onto the site. That plus the extra messing about with shoring and suchlike? I just don’t fancy my chances.
So, looking at the SUDS-type “crates� to create the required volume in a narrow strip next to the site boundary, but I don’t like the lack of access to the chamber these give.
What’s the life expectancy of these “crates�? Do they suffer from silting up? Should I buy\build a silt trap ahead of the chamber?
The other problem is that I *cannot* get fully 5m away from the existing building, going to end up at 4.5 max. Would it be sensible to wrap the “building� side of the chamber in non-permeable material to try and divert the water away from the building, or is it so close to correct that it’s not worth the trouble?
(Soil conditions seem good, no waterlogging that I can find)
Cheers.