Posted: Mon Jun 23, 2008 7:00 pm
Have just spent the last 2 hours tying my 3 reinforcing sheets together. As Im a sparky by trade I used single core 2.5mm2 copper cable to tie it all together. All nice and tight and secure...
1st question is this OK, I mean using the cable to tie it together? Im guessing as long as it all acts like one big sheet, which it does, I should be OK.
2nd Question, The reinforcing, should it be in the middle of the concrete for best effect or can it be flat within a varying depth base?
Basically my base varies in depth from around 150mm to 300mm. To get it right in the middle will be a pain in the proverbial but it would be alot easier to lay it on half bricks..whats the general consensus? Im pretty sure its well over engineered as it is but might as well do it a near to correct as possible!
Thanks.
1st question is this OK, I mean using the cable to tie it together? Im guessing as long as it all acts like one big sheet, which it does, I should be OK.
2nd Question, The reinforcing, should it be in the middle of the concrete for best effect or can it be flat within a varying depth base?
Basically my base varies in depth from around 150mm to 300mm. To get it right in the middle will be a pain in the proverbial but it would be alot easier to lay it on half bricks..whats the general consensus? Im pretty sure its well over engineered as it is but might as well do it a near to correct as possible!
Thanks.