Posted: Tue Jul 05, 2005 6:12 pm
I need to replace my patio and drop the level so its under the DPC. We've been told that we need to install 2 manholes where the drains change direction under the patio. At present there are smaller access panels/roding points (not sure which) in these locations. We believe the drains were updated sometime in the last 10 years but that they didn't inform building regs and therefore we don't know if the present access is sufficent.
Do I really need to install Manholes? or will the existing type of access suffice.
Do I really need to install Manholes? or will the existing type of access suffice.