Posted: Tue Jan 18, 2005 5:39 pm
Hi I'm a plumber by trade and have been asked to move a soil stack from the rear of the house to the side elevation (New conservatory planned for rear and would include stack and all waste outlets). To the side of the house is an inspection chamber, plastic approx 5 feet deep with plastic riser and chamber base. However where the new stack is planned for there is no inlet into the chamber. How difficult is it to remove the inspection chamber and base and fit new base with appropriate inlets and outlet. Surrounding area is paving slabs, chamber approx 2 feet from house?
Many thanks Bob The Plumber
Many thanks Bob The Plumber