Posted: Fri Dec 03, 2004 9:20 pm
im doin a hnc in construction,im doin drainage at the moment as im a joiner to trade.i dont have any information for this question and i was anyone knows anything on it.i have to DESCRIBE THE METHOD OF LAYING A FLEXIBLE JOINTED DRAIN USING CLASS D INFILL-BACKFILL