Posted: Mon May 10, 2004 11:26 pm
Hi,
I am just wondering if anybody out there knows of any neat tips for achieving a slope for drainage when laying crazy paving. The surface I am laying on is concrete but has poor drainage, that is it starts off sloping ok, but the slope is not consistant. The area is a basic square about 17x17 feet.
I was going to approach the matter using string as a guide. Whats the best way to set it up before I start the job.
Any help very much appreciated,
Ta
Alan
Ireland
I am just wondering if anybody out there knows of any neat tips for achieving a slope for drainage when laying crazy paving. The surface I am laying on is concrete but has poor drainage, that is it starts off sloping ok, but the slope is not consistant. The area is a basic square about 17x17 feet.
I was going to approach the matter using string as a guide. Whats the best way to set it up before I start the job.
Any help very much appreciated,
Ta
Alan
Ireland