Posted: Sun Nov 02, 2003 12:06 pm
Dear Tony,
I will be possibly laying a gravel drive in the near future. I haven't checked the existing levels properly as yet but it looks like it may slope slightly towards the bungalow. Is it necessary to install linear drainage channels or will surface water drain okay through the sub-base which will be 100mm compacted type 1?
Regards
Gary
I will be possibly laying a gravel drive in the near future. I haven't checked the existing levels properly as yet but it looks like it may slope slightly towards the bungalow. Is it necessary to install linear drainage channels or will surface water drain okay through the sub-base which will be 100mm compacted type 1?
Regards
Gary