Posted: Thu Jun 05, 2003 2:25 pm
I am extending (again) and i need to lay quite a bit of drainage, i was going to go with plastic for all the new stuff as there is so much. However i have 4 quesions
1. i have priced up a plastic inspection chamber and with risers and cover they are comming in at about 200 quid each!!, is this the going rate or is the builders merchant ripping me off?
2. where the drain goes under the floor slab, do i bed it on the same bedding as outside and then put hardcore on top or do i also put the same bedding on top upto the bottom of the floor slab? the top of the pipe will be approx level with the bottom of the hardcore.
3. do the inspection chambers need to go on a concrete plinth?
4. can i put bends on the entry to the IC and how big 45deg?
thanks
1. i have priced up a plastic inspection chamber and with risers and cover they are comming in at about 200 quid each!!, is this the going rate or is the builders merchant ripping me off?
2. where the drain goes under the floor slab, do i bed it on the same bedding as outside and then put hardcore on top or do i also put the same bedding on top upto the bottom of the floor slab? the top of the pipe will be approx level with the bottom of the hardcore.
3. do the inspection chambers need to go on a concrete plinth?
4. can i put bends on the entry to the IC and how big 45deg?
thanks