Posted: Mon Nov 23, 2020 10:23 am
Hi,
First-time poster and longtime admirer of this website. I moved over from Ireland in 2012, I came straight out of university to work as a setting out Engineer in Manchester, and to be honest, I was a bit wet behind the ears. This website was a godsend giving me clear and to the point descriptions of everything from drainage installation to paving/flag laying.
Last week I started helping out on a small housing project that is running behind and has had some level issues. In one garden the flagger is laying porcelain flags onto a wet mix mortar directly onto approx 4-inch of pipe bedding. Has anyone seen pipe bedding used as a sub-base layer? I've checked the website and forum but couldn't see anything. When I questioned it I was told that it's the way the Germans do it! The drawings stated a more typical construction of sand on asphalt binder on type 1.
Cheers,
Mick
First-time poster and longtime admirer of this website. I moved over from Ireland in 2012, I came straight out of university to work as a setting out Engineer in Manchester, and to be honest, I was a bit wet behind the ears. This website was a godsend giving me clear and to the point descriptions of everything from drainage installation to paving/flag laying.
Last week I started helping out on a small housing project that is running behind and has had some level issues. In one garden the flagger is laying porcelain flags onto a wet mix mortar directly onto approx 4-inch of pipe bedding. Has anyone seen pipe bedding used as a sub-base layer? I've checked the website and forum but couldn't see anything. When I questioned it I was told that it's the way the Germans do it! The drawings stated a more typical construction of sand on asphalt binder on type 1.
Cheers,
Mick