Posted: Mon Aug 26, 2019 1:22 pm
Hi all - first post etc.
As topic says, I'm using blue slate for SWMBO's latest garden project.
Was wondering best way to do things..
SBR slurry on the back of the slate for laying on full bed
It's about 16 sqm area but was wondering if I should lay a section then point that section before moving on.. or lay the lot, then point it up.
If lay the lot, how long do I leave it laid before walking on it and pointing it? Saw somewhere saying 3-5 days, yeah?
Also saw on here some good results with that 'vdw 850 plus' resin stuff. Allowing for 10mm gaps max (give or take) Anyone willing guesstimate how many tubs I'd need for 16sqm
Any help would be greatly appreciated.
Thanks in advance,
Tonks
As topic says, I'm using blue slate for SWMBO's latest garden project.
Was wondering best way to do things..
SBR slurry on the back of the slate for laying on full bed
It's about 16 sqm area but was wondering if I should lay a section then point that section before moving on.. or lay the lot, then point it up.
If lay the lot, how long do I leave it laid before walking on it and pointing it? Saw somewhere saying 3-5 days, yeah?
Also saw on here some good results with that 'vdw 850 plus' resin stuff. Allowing for 10mm gaps max (give or take) Anyone willing guesstimate how many tubs I'd need for 16sqm
Any help would be greatly appreciated.
Thanks in advance,
Tonks