Posted: Wed May 08, 2019 10:53 am
Hi all ,last year I laid a black slate patio 80 sq m .someone else had laid the sub base ,it wasn't scalpings like I would use,but that recycled crush you get .it had been wacked but it didn't look that great as there were areas where it looked to be thinner than others .he is a friend of a mate an assured me it would be fine.
black slate came an looked pretty good 25-35 mm thickness it was unbranded an no laying instructions. i laid on a full bed sharp cement mix (I have done two slate ones before with no probs)random pattern an came out really well .
anyway he calls me to come an have a look as the 900x600 ones have unkeyed, not rocking but that sound you know!all the other sizes seemed fine.so I done some research an that led me to your fine site which tells me that maybe they should have been sbr`d.I went back an lifted 24 of the big ones an sbr`d them back down,what I did notice when doing this was like 10mm cracks here an there through my bedding mix an subbase (like how it goes on a dry summer )could this have anything to do with it ??.
I gave him three days of labour at no cost,i have said I cant do any more freebies .I don't feel great about it ,but I think the product should have specified sbr on the back of the slabs or is it a combination of both ??bedding course 25 mm to 80 mm.
any advice on how to proceed as he has called again?
thanks dancer
black slate came an looked pretty good 25-35 mm thickness it was unbranded an no laying instructions. i laid on a full bed sharp cement mix (I have done two slate ones before with no probs)random pattern an came out really well .
anyway he calls me to come an have a look as the 900x600 ones have unkeyed, not rocking but that sound you know!all the other sizes seemed fine.so I done some research an that led me to your fine site which tells me that maybe they should have been sbr`d.I went back an lifted 24 of the big ones an sbr`d them back down,what I did notice when doing this was like 10mm cracks here an there through my bedding mix an subbase (like how it goes on a dry summer )could this have anything to do with it ??.
I gave him three days of labour at no cost,i have said I cant do any more freebies .I don't feel great about it ,but I think the product should have specified sbr on the back of the slabs or is it a combination of both ??bedding course 25 mm to 80 mm.
any advice on how to proceed as he has called again?
thanks dancer