I'm looking to pave an area that is bounded by a low retaining wall that drops down to a lawn, and would like the finished paving to be flush with the front face of the wall (or perhaps jutting over by an inch or so).
Do I just need to ensure that the sub base is level with the top of the wall or is a different approach called for? My concern is that even a tiny amount of "settling" of the sub-base is going to cause issues to the flags that will be sitting partially on the wall and partially on the sub-base.
Laying flags to front of retaining wall
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
Make sure the sub-base is properly and thoroughly compacted, then allow for a 10-12mm mortar joint between top of wall and underside of flag, but 30-40mm mortar bed between sub-base and underside of flag.
If there is any minor settlement of the sub-base (1-3mm), the mortar bed should be able to carry the flag without too much of a problem, but if you do get significant settlement (>3mm) then look to re-lay the flags at the wall edge.
If there is any minor settlement of the sub-base (1-3mm), the mortar bed should be able to carry the flag without too much of a problem, but if you do get significant settlement (>3mm) then look to re-lay the flags at the wall edge.
Site Agent - Pavingexpert