Posted: Tue Apr 25, 2017 10:51 am
Following on from my previous posts, the fence is rotten (but stable) in our new house, in one area the patio is next to a fence post.
Fencing guy said needs room to dig out old concrete, so that means moving the slab of the patio...
If we remove the last row of slabs and put gravel down it would be fine, however a we would need to cut two straight lines in two of the remaining slabs keep it straight
Is it possible to cut the symphony with a straight edge once laid?
I wont be attempting this myself, I will get paving installer to do it, just checking if what I propose if feasible or do I need to find other solutions?
Thanks
Fencing guy said needs room to dig out old concrete, so that means moving the slab of the patio...
If we remove the last row of slabs and put gravel down it would be fine, however a we would need to cut two straight lines in two of the remaining slabs keep it straight
Is it possible to cut the symphony with a straight edge once laid?
I wont be attempting this myself, I will get paving installer to do it, just checking if what I propose if feasible or do I need to find other solutions?
Thanks