Page 1 of 1

Posted: Fri Sep 30, 2016 9:24 pm
by skyrakes
Do I need to ensure the flags are wet (Soaked with a hose pipe( before laying on the cement base?

Posted: Sat Oct 01, 2016 4:09 pm
by lemoncurd1702
Just wet the back of each one as you go or preferably a priming/bonding slurry which can be made by mixing sbr with. cement powder.

Posted: Sat Oct 01, 2016 4:27 pm
by skyrakes
Thanks