Posted: Wed May 09, 2007 8:53 am
Hi,
My Fiance and I are turning the crazy paved front garden into a driveway but are paving newbees. Reading the crazy paving section on this site it recommends using C20 Concrete base to 100mm thick but also mentions a sand and cement mix and using a sub-base of aggregate. As the driveway will be sloping down to the curb at a 25-30degree angle whould we still be able to use a concrete base and if so do we have to wait for the concrete to dry before putting on the crazy paving as I cannot figure out how it would stay in place if its not wet. I see about the wet grouting - would that be sufficient to hold it in place? Any ideas would be gratefully received.
My Fiance and I are turning the crazy paved front garden into a driveway but are paving newbees. Reading the crazy paving section on this site it recommends using C20 Concrete base to 100mm thick but also mentions a sand and cement mix and using a sub-base of aggregate. As the driveway will be sloping down to the curb at a 25-30degree angle whould we still be able to use a concrete base and if so do we have to wait for the concrete to dry before putting on the crazy paving as I cannot figure out how it would stay in place if its not wet. I see about the wet grouting - would that be sufficient to hold it in place? Any ideas would be gratefully received.