Posted: Fri Apr 11, 2014 5:46 pm
by Diygirl
I'm now in the possession of 3 tonnes of MOT Type 1 sub base and a plate compactor. This weekend I plan on compacting the sub base after we finish transferring it from the front yard.

I started putting down some string across the sub base to gauge the right depth, but then hammered in some posts as well, with a line to fill up to. I'm not really sure how best to measure the levels, and I guess I'll have to remove the posts and lines when I start compacting. Also, how accurate can you get the levels before and after compacting? Any tips?

Image

Posted: Fri Apr 11, 2014 5:48 pm
by Diygirl
I've also out some bricks down to stop the stones falling out the edge. Can I just remove these after compacting, or should I keep them. I'm a little confused about how to do the edge.

Image

Posted: Fri Apr 11, 2014 5:58 pm
by lutonlagerlout
those bricks are going to move
you need a permanent retainer to hold the type 1 in place
we try and get the type 1 70mm below finished suurface and then wack the lot

dont wear flip flops

LLL

Posted: Fri Apr 11, 2014 6:56 pm
by Diygirl
What do I make a permanent retainer out of? I'm guessing I need to do that pretty quickly before compacting.

Posted: Fri Apr 11, 2014 7:10 pm
by KLS
Mortar the bricks I place. If it's not many get some bags of ready mixed mortar from b&q or wickes, then you cm just add water to it instead of gauging soft sand and cement for a mix.