Hi there I have a job to do and I no I can do the work but have prob with the maths wise off it but I have a 60 square meter of slabs to lay and how I work it out:
3 ton of sand
2 tone of ballest
20 cerment
Put the ballest down and waker plate it down then put some sand down then mix some cerment up with the sand its for the back garden and it use as easy to pick up dog foul
Was ratio do u use as I have ask loads of ppl and they tell me all diffrent but I would use 4 sand and 2 cerment is that rite
Many thanks dale