Posted: Fri Mar 29, 2013 8:43 pm
Hi guys,
I have just laid half of my patio (natural sandstone) onto a base of 4:1 grit sand and cement "dry" mix using the screeding method.
The patio has had a week or so to go off and probably around 30% of the slabs seem to have fixed in place. However, the rest of them have a slight rock to them when I walk over them and there are a couple that are rocking significantly despite being laid on a very level screed mix which was in turn on a decent sub base of well compacted crusher run.
I intend to use a resin based grout in between the slabs and am wondering if I need to re-start the patio at this point and switch to a wet mix or whether I'd be ok with this slight rocking in terms of the resin mix holding it sturdy?
Any thoughts would be great!
I have just laid half of my patio (natural sandstone) onto a base of 4:1 grit sand and cement "dry" mix using the screeding method.
The patio has had a week or so to go off and probably around 30% of the slabs seem to have fixed in place. However, the rest of them have a slight rock to them when I walk over them and there are a couple that are rocking significantly despite being laid on a very level screed mix which was in turn on a decent sub base of well compacted crusher run.
I intend to use a resin based grout in between the slabs and am wondering if I need to re-start the patio at this point and switch to a wet mix or whether I'd be ok with this slight rocking in terms of the resin mix holding it sturdy?
Any thoughts would be great!