Posted: Tue Jul 24, 2012 9:25 am
Hi
Just about to order the hardcore for the sub base and sand/cement but want to double check my calculations are ok before I order.
The area I need to prepare is
3500mm x 6000mm
with a depth of
360mm dropping to 300mm
I worked this out as 21 sqm and laying at a depth of 330mm so would need ~14 ton of hardcore (compacted).
For a 50mm 10:1 sand/cement on top (and for about 2sqm more) I reckon ~2 ton sand and 7 bags of cement.
I never done higher maths so wouldn't mind some of you more knowledgeable people having a once over it and making sure I'm not missing the obvious. Feel free to correct my mistakes!
Cheers
Neil
EDIT
I now notice the typo in the subject doh! :laugh:
Just about to order the hardcore for the sub base and sand/cement but want to double check my calculations are ok before I order.
The area I need to prepare is
3500mm x 6000mm
with a depth of
360mm dropping to 300mm
I worked this out as 21 sqm and laying at a depth of 330mm so would need ~14 ton of hardcore (compacted).
For a 50mm 10:1 sand/cement on top (and for about 2sqm more) I reckon ~2 ton sand and 7 bags of cement.
I never done higher maths so wouldn't mind some of you more knowledgeable people having a once over it and making sure I'm not missing the obvious. Feel free to correct my mistakes!
Cheers
Neil
EDIT
I now notice the typo in the subject doh! :laugh: