Hi
I plan on paving an area about 4mx4m s, enclosed on 3 sides with walling and one side is the house with drainage channels already in situ.
I will be using sandstone with some form of sett edging (granit/stone).
Do i start by laying all the edging first with required fall then just string that t get slabs levels and cut all the slabs as required ?
Whats the process peeps ??
I do have pics here somewhere as this has been on hold for AGES since i have been very busy.
I can get a pic up if needed.
Cheers
I plan on paving an area about 4mx4m s, enclosed on 3 sides with walling and one side is the house with drainage channels already in situ.
I will be using sandstone with some form of sett edging (granit/stone).
Do i start by laying all the edging first with required fall then just string that t get slabs levels and cut all the slabs as required ?
Whats the process peeps ??
I do have pics here somewhere as this has been on hold for AGES since i have been very busy.
I can get a pic up if needed.
Cheers