Posted: Sun Jun 17, 2012 8:26 pm
Hi, i'm currently having an Indian Sandstone patio and path laid by a local paving guy (been in the business years and plenty of good feedback).
The patio section measures 2.4m x 4.1m, 4.1m being the width of the house and the 2.4m being the distance between the house and small retaining wall.
Theres a drain in the center of the house and a smaller drain in the corner for the gutters.
Its been 1/2 laid at the minuet, but what has been laid seems to be on a fair old slope, it drops 3" from the retaining wall to the house, and thats only over 2.4m ! Its also slightly sloped to run into either drain.
I'm far from an expert but this seems a little excessive to me, when standing on it you can feel its on a slope, obviously its gonna have to be on a slight slope but surely not a drop of 3" ?
I've got the guy coming to finish the job in the morning (monday), i have spoke to him over the weekend airing my concern but hes saying that thats how it needs to be, saying that indian sandstone needs more of a slope for as its got a rough / uneven finish.
As it is at the minuet i don't think i'd be happy with it, would it be possible to have less of a drop or does it need to be 3" ?
Any advice would be appriciated.
Cheers
The patio section measures 2.4m x 4.1m, 4.1m being the width of the house and the 2.4m being the distance between the house and small retaining wall.
Theres a drain in the center of the house and a smaller drain in the corner for the gutters.
Its been 1/2 laid at the minuet, but what has been laid seems to be on a fair old slope, it drops 3" from the retaining wall to the house, and thats only over 2.4m ! Its also slightly sloped to run into either drain.
I'm far from an expert but this seems a little excessive to me, when standing on it you can feel its on a slope, obviously its gonna have to be on a slight slope but surely not a drop of 3" ?
I've got the guy coming to finish the job in the morning (monday), i have spoke to him over the weekend airing my concern but hes saying that thats how it needs to be, saying that indian sandstone needs more of a slope for as its got a rough / uneven finish.
As it is at the minuet i don't think i'd be happy with it, would it be possible to have less of a drop or does it need to be 3" ?
Any advice would be appriciated.
Cheers