Posted: Wed May 30, 2012 11:17 pm
hi - first time poster so go easy.
probably a stupid question but i'm a little confused over the 'permeability' issue when using rompox. I'm laying sandstone pavers on a dry mix bed and want to use rompox to point with.
The laying course is on a concrete floor of a knocked down shed which is about 2ft off ground level (raised patio).
As rompox is a permeable jointing product will water seepage cause a future problem? or will the fall be sufficient to remove the water?
cheers for any suggestions.
probably a stupid question but i'm a little confused over the 'permeability' issue when using rompox. I'm laying sandstone pavers on a dry mix bed and want to use rompox to point with.
The laying course is on a concrete floor of a knocked down shed which is about 2ft off ground level (raised patio).
As rompox is a permeable jointing product will water seepage cause a future problem? or will the fall be sufficient to remove the water?
cheers for any suggestions.