Posted: Wed Mar 28, 2012 8:10 pm
going to be putting a step in soon, straight off the sub base that the patio will be going on around the step, got sandstone walling blocks to go round the edge, then I was just going to bed a flag on the top, should I be filling it with lean mix? the step will be breaching the DPC 150mm rule.
After the step I will be staring the patio, I am still undecided about pointing romex d1, sand and cement, gftk, flowpoint, easipoint etc. do I need to decided beforehand because it will make difference to how I lay the flags ie. buttering, joint depth etc.
After the step I will be staring the patio, I am still undecided about pointing romex d1, sand and cement, gftk, flowpoint, easipoint etc. do I need to decided beforehand because it will make difference to how I lay the flags ie. buttering, joint depth etc.