Posted: Wed Feb 16, 2011 12:23 pm
We are intending to lay about 120m2 of Sandstone Slabs that are 1200mm x 600mm on a clay soil to form a patio (pedestrian traffic only).
Had various opinions on sub-base. This site seems to indicate we should have 75mm of compacted MOT and then a 20mm sand/cement bedding.
One contractor thought we should have a 100mm mot then 100mm screed (with steel mesh in) with slabs laid directly on top.
My thinking was to do 50mm MOT (to falls) then 100mm reinforced concrete slab then 40mm sand/cement bedding.
Any opinions?
Soil is clay, but quite wet (was not going to do till May), but is well compacted down, but does dry out in summer and crack.
Had various opinions on sub-base. This site seems to indicate we should have 75mm of compacted MOT and then a 20mm sand/cement bedding.
One contractor thought we should have a 100mm mot then 100mm screed (with steel mesh in) with slabs laid directly on top.
My thinking was to do 50mm MOT (to falls) then 100mm reinforced concrete slab then 40mm sand/cement bedding.
Any opinions?
Soil is clay, but quite wet (was not going to do till May), but is well compacted down, but does dry out in summer and crack.