Posted: Fri May 07, 2010 9:28 am
Hello
I’m laying a new patio and have broken up and removed the existing concrete surface. The delivery of the new paving may take up to two weeks to arrive. Do I need to cover the exposed ground which is next the house with plastic sheets to keep it dry or will it be ok to leave until the paving arrives? I'm concerned about water soaking into the foundations.
Thanks
I’m laying a new patio and have broken up and removed the existing concrete surface. The delivery of the new paving may take up to two weeks to arrive. Do I need to cover the exposed ground which is next the house with plastic sheets to keep it dry or will it be ok to leave until the paving arrives? I'm concerned about water soaking into the foundations.