Posted: Thu Oct 01, 2009 10:47 am
I've laid a patio as such:-
Tamped existing hogging / made ground
50mm blinding of ballast:sharp:cement
100-150mm scalpings (Type1)
4:1 damp screed bed
A few cuts to do around te edge of building
I now have to leave it for just over a week as I'm going away - it will be unpointed until I return.
Do you see any problem with the above??
I was thinking of covering it with a membrane but I've been told the rain will actually help????
Also, when I return I was thinking of applying a Lithothin MS sealer / colour intensifier before doing the pointing (which will be a 3:1 wet mortar) --- anyone any opinion on if that's right or how it would look???
Any advice grateully recieved.
Tamped existing hogging / made ground
50mm blinding of ballast:sharp:cement
100-150mm scalpings (Type1)
4:1 damp screed bed
A few cuts to do around te edge of building
I now have to leave it for just over a week as I'm going away - it will be unpointed until I return.
Do you see any problem with the above??
I was thinking of covering it with a membrane but I've been told the rain will actually help????
Also, when I return I was thinking of applying a Lithothin MS sealer / colour intensifier before doing the pointing (which will be a 3:1 wet mortar) --- anyone any opinion on if that's right or how it would look???
Any advice grateully recieved.