Posted: Thu Jun 18, 2009 12:37 pm
Hi
During the recent bad weather the road gutters overflowed into my front garden and the Castlecomber? paving is now mottled black and is unlevel. I have got a number of quotes from €1000 to €4000 to lift the paving, relevel the garden, refitting the paving and power clean at the end. The work will take 2 days. My front garden is about 80sqmts. There are no fancy designs. My query is why the difference in quotes I only paid €2500 to have the garden done (4 years ago) and that was including the buying of the bricks. Also, I have been told by contractors that a power wash won't clean the paving that it needs to be chemically cleaned. I don't want to go to the expense of doing all of this and not liking the results. The quote to replace the paving is €6000. I am beginning to feel that I am being duped and already had a bad experience when replacing my gutters which instead of costing €1000 ended up costing me €3000 as I had to get another contractor in to fix the damage caused by the first guy. Can somebody please advise me what I should be looking out for?
Thanks
During the recent bad weather the road gutters overflowed into my front garden and the Castlecomber? paving is now mottled black and is unlevel. I have got a number of quotes from €1000 to €4000 to lift the paving, relevel the garden, refitting the paving and power clean at the end. The work will take 2 days. My front garden is about 80sqmts. There are no fancy designs. My query is why the difference in quotes I only paid €2500 to have the garden done (4 years ago) and that was including the buying of the bricks. Also, I have been told by contractors that a power wash won't clean the paving that it needs to be chemically cleaned. I don't want to go to the expense of doing all of this and not liking the results. The quote to replace the paving is €6000. I am beginning to feel that I am being duped and already had a bad experience when replacing my gutters which instead of costing €1000 ended up costing me €3000 as I had to get another contractor in to fix the damage caused by the first guy. Can somebody please advise me what I should be looking out for?
Thanks