Hi all, looking for a bit of help.
I have a two-strip driveway in place at the moment but it's seen better days. I have decided i am going to dig it out and lay new slabs and stone chips in the some lay out as before. I have a few questions listed below.
Do i need to dig down the full 200mm and lay a sub base?
or is 50mm enough to dig out and just lay the slabs and stone chip on top of the grit sand layer?