Page 1 of 1

Posted: Mon Jun 30, 2008 7:28 pm
by RodA
I've just laid a new slab path, it was laid on sharp sand and I'm pleased with the result. However, I had some sharp sand left so I used it for the dry pointing in a 1 to 4 mix. It's rained several times since I did the pointing and the dry mortar mix has not set hard, it’s still as loose as when I brushed it in. I have a horrible feeling that I should have used soft sand so that it bonded to the cement in the dry mortar mix, am I right?

Posted: Mon Jun 30, 2008 8:39 pm
by dig dug dan
almost

what you should have done was a wet point mix. Brushing the stuff in dry never works.

Generally i point with 3-1 soft sand cement, sometimes 4-1. but never dry mix swept in

you will need to remove it all and start again i'm afraid!

Posted: Tue Jul 01, 2008 10:04 pm
by Tony McC
Why do people persist with dry mix jointing? Waste of effing time! :(

Posted: Fri Jul 11, 2008 6:21 pm
by Slabba.
Dito tony.!!

Posted: Fri Jul 11, 2008 8:13 pm
by RodA
An update, I dug out the dry mix and replaced it with a 3:1 soft sand wet mix with some buff colouring added. I used a mortar gun this time which worked well and avoided staining on the slabs (the reason I tried a dry mix first time around). It's fine now!

"Why do people persist with dry mix jointing? - Tony McC"

Because I'm a DIYer and don't know any better, but then the mistake only cost me a small bag of soft sand and a little bit of cement, my times comes completely free!