Posted: Thu May 08, 2008 10:31 am
I've just laid paving slabs around an existing pond with a 2 - 3inch pond overhang. I've mortared the joints where there is a base but my problem is what to do about the gaps between the unsupported overhang. I realy do want to continue the mortared joint to the slab edge any suggestion ?. My intial thoughts were to attach something under the slab to give a base for the mortar. I thought about gluing plastic for flexibility , metal would be fimer but with flex it might crack slab etc + it would corrode over time and stain..
The other problem I have is because the pond has a complex shape one overhang slab is not as well supported as I would like any suggestions ?